Hi, my name is Nirvan. I'm the director of The 1 Second Film, and keep this blog as a production journal. We also have an open Producers Blog and a collection of perfect moments.

For those interested in how a Drupal site is developed, I'm posting our current "to do" list for our web development.
Web development happens in stages, much like film production. 'Pre-production' of the new site is now pretty much done. We have a detailed technical spec, a plan of attack, and a bunch of stuff to do. We have started production, and will be heavy into it for the next two months. Then post-production is the launch and all the bug fixes.
Here is the current To Dos from Ciplex:
.............................................................
Tasks for Basic Drupal installation.
Vladimir Mijin: Please install Editor as part of current installation. I like FCKeditor, but if you have more experience with Tiny that works for me. This will give client the option to start working on static pages.
Site setup will be a build of the site with core drupal modules working and limited registration and buddylist functionality. Site may work in Garland, but not in 1secondfilm theme.
Vladimir Mijin: Registration v. 0.5 complete. Not all functionality, but work working. Most content types completed.
client will be able to start inputing the static pages into Drupal.
Vladimir Mijin: Donation Module chosen and development started.
Vladimir Mijin: All contributed modules installed and set up. Note: not all content types or views will be set up.
Vladimir Mijin: Editor Installed and working, Client can start inputing static pages.
At this phase the registration process will work, and we will have all content types input and setup. Again functionality will be the goal and may not be 100% themed.
Vladimir Mijin: Registration v. 1.0
Vladimir Mijin: Content Types set up.
Vladimir Mijin: All modules working, and up to spec. Client will be able to test all functions.
Vladimir Mijin: Theme 70% complete.
Michal Minecki: Internal QA of data import.
Nirvan Mullick: Client QA of data import.
Nirvan Mullick: Client sign off for second 1/3 payment.
We are paying for the web development in thirds. The first third was paid upfront, the next payment will be when we reach the mid-point of development, and the final third is upon completion of the site.
i'm off to do.
a film by The Collaboration Foundation 2008 |
1 day 3 hours ago
3 days 3 hours ago
3 days 8 hours ago
3 days 14 hours ago
3 days 14 hours ago
3 days 14 hours ago
3 days 15 hours ago
3 days 15 hours ago
3 days 15 hours ago
3 days 23 hours ago